Table of Contents
Relevance: GS Paper II: Cooperative Federalism and Inter-State River-Water Disputes
Prelims Keywords
- Interlinking of Rivers | National Perspective Plan | Himalayan Component | Peninsular Component | NWDA | Inter-basin Water Transfer | Ken–Betwa Link | Article 262
Mains Keywords
- Water Federalism | Integrated River-basin Management | Demand-side Management | Ecological Flows | Groundwater Depletion | Climate-resilient Water Management | Participatory Water Governance
Why in News?
The union home minister has proposed linking major rivers from the Brahmaputra to the Godavari and Cauvery to address long-term water scarcity. However, unresolved inter-State disputes, ecological risks, displacement and limited progress in existing projects have renewed debate over the feasibility of large-scale river interlinking

What is Interlinking of Rivers?
- The Interlinking of Rivers (ILR) programme is a large-scale water-management initiative that seeks to transfer water from water-surplus basins to water-deficit regions.
- The transfer is proposed through a network of reservoirs, dams, canals and diversion structures.
- The programme is based on the assumption that some river basins have surplus water that can be transferred to regions experiencing shortages.
Inter-basin Water Transfer
- Inter-basin water transfer means moving water across the natural boundary of one river basin into another.
- Supporters view it as a way to redistribute water, while critics question whether a river basin can be permanently classified as surplus because water availability changes across seasons and years.
Historical Background
- The idea of linking Indian rivers dates back to the 19th century, when Sir Arthur Cotton proposed river-based irrigation and navigation projects.
- The proposal gained attention after Independence due to India’s uneven rainfall distribution and recurring floods and droughts.
- In 1980, the Ministry of Water Resources formulated the National Perspective Plan for interlinking rivers.
- The National Water Development Agency (NWDA) was established in 1982 to examine the feasibility of river-linking projects.
National Perspective Plan
- The National Perspective Plan identified 30 major river links.
- These are divided into two components: 14 links under the Himalayan component and 16 links under the Peninsular component.
Himalayan Component
- It broadly seeks to link rivers originating in the Himalayan region and transfer water across northern and eastern river basins.
Peninsular Component
- It focuses on linking rivers in peninsular India to transfer water between relatively water-rich and water-deficit regions.
Role of the NWDA
- The NWDA studies the feasibility of river-linking proposals.
- Its work includes assessing river flows, identifying possible links and examining whether water transfers can be technically implemented.
- The agency maintains that river-link planning accounts for the need to improve or protect river flows during lean periods.
Objectives of River Interlinking
Water Security
- The programme seeks to transfer water from relatively water-rich basins to water-deficit areas and reduce regional disparities.
Irrigation Expansion
- Additional water could expand irrigation, support crop diversification, increase agricultural productivity and improve farmers’ incomes.
Flood and Drought Management
- Supporters argue that excess water during floods could be diverted to water-scarce regions, reducing the impact of floods and droughts.
Drinking and Industrial Water
- Inter-basin transfers could improve water availability for cities, industries and rural communities facing shortages.
Hydropower Generation
- Reservoirs and related infrastructure may provide opportunities for generating hydropower.
Balanced Regional Development
- Improved irrigation, water supply, navigation and rural infrastructure could support employment and economic development in water-deficit regions.
Integrated River-basin Management
- River interlinking may encourage coordinated planning of water resources across political and administrative boundaries.
Inter-State Water Disputes in Southern India
- Several southern rivers flow through more than one State, resulting in disputes over dams, irrigation projects, reservoir operations and water sharing during periods of scarcity.
- The delay in resolving existing disputes demonstrates the difficulty of achieving the level of inter-State cooperation required for large-scale river interlinking.
Pennaiyar River Dispute
- Tamil Nadu requested the Union government in November 2019 to constitute a tribunal for adjudicating its Pennaiyar river dispute with Karnataka.
- Tamil Nadu alleged that Karnataka had violated the 1892 inter-State agreement and also approached the Supreme Court.
- Two negotiation committees were constituted and 11 meetings were held, but the dispute remained unresolved.
- The Supreme Court directed the Centre to constitute a tribunal and later extended the deadline by six months. However, the tribunal had not been established at the time covered by the source.
Proposal to Use the Mahadayi Tribunal
- The Union government asked whether the Pennaiyar dispute could be referred to the Mahadayi Water Dispute Tribunal instead of constituting a separate tribunal.
- The Pennaiyar and Mahadayi disputes concern different river systems and geographical regions.
- The article argues that such a transfer is not permitted under the Inter-State River Water Disputes Act, 1956.
Mekedatu Project Dispute
- Karnataka’s proposed Mekedatu dam project has faced opposition from Tamil Nadu over concerns about downstream water availability.
- Tamil Nadu requested the Union government in March 2026 to constitute a tribunal on the project.
- The Centre had not responded to this demand at the time covered by the source.
Arguments in Favour of River Interlinking
Improving Agricultural Productivity
- Additional irrigation could increase agricultural output, support crop diversification and improve farmers’ incomes.
- The Indira Gandhi Canal Project helped expand irrigation and agriculture in arid parts of Rajasthan.
Enhancing Water Security
- Water could be transferred from relatively water-rich basins to drought-prone and water-deficit regions.
- The Ken–Betwa Link Project, for example, aims to provide irrigation and drinking water to the Bundelkhand region of Madhya Pradesh and Uttar Pradesh.
Managing Floods and Droughts
- Diversion of excess water during high-flow periods could reduce flood pressure while supporting water-scarce regions.
- Proponents argue that this could improve India’s long-term water resilience.
Supporting Urban and Industrial Needs
- Inter-basin transfers can help meet the drinking-water requirements of expanding cities.
- The Krishna Water Supply Project transfers Krishna river water to meet Hyderabad’s drinking-water needs.
Reducing Regional Imbalances
- Transferring water to dry regions could promote settlement, agriculture and economic development in areas with limited natural water availability.
Arguments Against River Interlinking
Difficulty in Identifying Surplus Water
- A river may carry excess water during a good monsoon but experience scarcity during a weak rainfall year.
- Calculations based on average flows may not accurately reflect seasonal variations, drought years or future climate conditions.
Climate-change Uncertainty
- Climate change is altering rainfall patterns, glacier behaviour and river flows.
- These changes make assumptions about permanent water-surplus and water-deficit basins increasingly uncertain.
Ecological Effects
- River ecosystems are interconnected. Changing natural flows can affect aquatic biodiversity, fish migration, wetlands, sediment transport, groundwater recharge and downstream ecosystems.
- Diversions may also alter the ecological balance of donor and recipient river basins.
Impact on the Vembanad Wetland
- Kerala opposes the Pamba–Achankovil–Vaippar Link Project.
- It argues that diverting water from the Pamba and Achankovil rivers could harm the Vembanad wetland ecosystem, into which these rivers drain.
Claims During Distress Years
- Recipient regions may begin to treat transferred water as a permanent entitlement.
- They may continue demanding water during drought years, potentially reducing supplies available to the original basin.
Inter-State Water Conflicts
- Rivers are shared by multiple States, making allocation politically sensitive.
- The Pennaiyar and Mekedatu disputes demonstrate the difficulty of securing agreement on river-water use.
Land Acquisition and Displacement
- Large dams, canals and reservoirs require extensive land.
- Such projects may displace local and tribal communities and affect livelihoods, cultural connections and access to natural resources.
Economic and Technical Difficulties
- River-linking projects involve high financial costs, complex engineering, continuous maintenance and long gestation periods.
- Growing resistance to land acquisition can further delay implementation.
Diversion from Sustainable Alternatives
- Excessive dependence on mega engineering projects may reduce attention to water conservation, watershed development, groundwater management and efficient use.
Successful Inter-basin Transfer Projects
Mullaperiyar Dam Project
- The project involves Kerala and Tamil Nadu.
- Water from the Periyar basin in Kerala is diverted to the Vaigai basin in Tamil Nadu for irrigation and drinking-water purposes.
- It has supported agriculture in the drought-prone regions of Tamil Nadu.
Parambikulam–Aliyar Project
- The project involves Kerala and Tamil Nadu.
- It is a multi-reservoir inter-State project that diverts waters from rivers of the Western Ghats to provide irrigation benefits in Tamil Nadu.
- It represents cooperation between States in sharing river water.
Krishna Water Supply Project
- The project is associated with Maharashtra, Karnataka, Telangana and Andhra Pradesh.
- It transfers Krishna river water to meet the drinking-water requirements of Hyderabad.
- It demonstrates the use of inter-basin transfers to address urban water shortages.
Indira Gandhi Canal Project
- The project involves Punjab, Haryana and Rajasthan.
- It transfers water from the Sutlej–Beas river system to the arid regions of Rajasthan.
- It transformed parts of the Thar Desert by expanding irrigation, agriculture and settlement.
Limited Number of Projects
- India has implemented only a handful of major inter-basin water-transfer projects during the last 130 years.
- Their limited number demonstrates the technical, financial, political and social difficulties involved.
Status of River-linking Efforts
- After returning to power in 2014, the Union government constituted a Special Committee for Interlinking of Rivers.
- The committee has held more than two dozen meetings.
- Despite these meetings, the national river-linking programme has made limited progress.
- Major barriers include State consent, water-sharing arrangements, environmental concerns, land acquisition, rehabilitation and questions over surplus-water availability.
Ken–Betwa Link Project
- The project seeks to transfer water from the Ken basin to the Betwa basin.
- It aims to provide irrigation and drinking-water benefits to drought-prone Bundelkhand in Madhya Pradesh and Uttar Pradesh.
- In 2024, the Prime Minister laid the foundation stone for the ₹44,000-crore project.
- The project has faced protests from tribal communities in Chhatarpur over displacement, environmental effects and loss of traditional livelihoods.
- It shows that technical and financial approval alone cannot ensure ecological sustainability or social acceptance.
Supply-side and Demand-side Approaches
Supply-side Approach
- A supply-side approach tries to increase water availability through dams, reservoirs, canals and inter-basin transfers.
- River interlinking follows this approach because it transports additional water to areas experiencing shortages.
Demand-side Approach
- Demand-side management focuses on conserving existing water, reducing wastage and improving water-use efficiency.
- It includes micro-irrigation, groundwater conservation, rainwater harvesting, watershed management and restoration of traditional water bodies.
- It also involves sensitising and incentivising farmers to use irrigation water efficiently.
- The article argues that governments and civil society should prioritise demand management instead of continuously depending on mega supply-side projects.
Challenges
Federal and Governance Challenges
- States may disagree over surplus-water calculations, project designs, costs and allocation arrangements.
- Delays in creating tribunals and implementing decisions weaken dispute-resolution mechanisms.
Ecological Challenges
- Altered river flows may affect biodiversity, wetlands, sediment movement, groundwater recharge, fisheries and downstream ecosystems.
- Climate change makes long-term water-availability estimates increasingly uncertain.
Social Challenges
- Large projects can displace local and tribal communities.
- Fair compensation, rehabilitation and livelihood restoration remain difficult.
Economic and Technical Challenges
- Mega projects involve high financial costs, complex engineering, long construction periods and continuous maintenance.
- Extensive land acquisition can delay projects and increase opposition.
Water-use Challenges
- Additional water may not solve scarcity if agricultural consumption remains inefficient.
- Indiscriminate groundwater extraction, including extraction encouraged by free agricultural electricity, can worsen ecological stress.
Institutional Challenges
- More than two dozen committee meetings have not produced substantial progress.
- Limited consensus among States can delay individual links and the wider programme.
Way Forward
Strengthen Water-governance Institutions
- The National River Linking Project and ILR programme should follow a scientific, transparent and participatory approach.
- The NWDA should conduct detailed basin-level studies before recommending transfers.
Improve Dispute Resolution
- Mechanisms under the Inter-State River Water Disputes Act, 1956 should be strengthened to ensure timely tribunal formation and implementation of decisions.
- The constitutional framework under Article 262 should support equitable and cooperative management of inter-State rivers.
Adopt Basin-level Planning
- Planning should consider the entire river basin, including downstream users, wetlands, ecological flows and seasonal variations.
- States, technical experts, local communities and other stakeholders should participate in decision-making.
Introduce Climate-risk Assessment
- Project planning should account for changing rainfall patterns, glacier behaviour, droughts and extreme weather.
- Surplus-water calculations should not depend only on past average flows.
Strengthen Environmental Safeguards
- Projects should undergo credible environmental-impact assessments.
- Ecological flows, aquatic biodiversity, sediment movement, groundwater recharge and downstream ecosystems must be protected.
Ensure Rehabilitation and Community Participation
- Affected communities should participate in project planning, compensation, rehabilitation and livelihood restoration.
- Tribal and local rights must be considered before land acquisition.
Prioritise Demand-side Management
- India should expand micro-irrigation, groundwater conservation, rainwater harvesting, watershed management and restoration of traditional water bodies.
- Farmers should be sensitised and incentivised to use water efficiently.
Regulate Groundwater Extraction
- Indiscriminate extraction should be curbed, particularly where free electricity encourages excessive pumping.
Examine Local Alternatives First
- Local water harvesting, aquifer recharge, efficient irrigation and restoration of tanks should be examined before approving mega transfers.
Promote Cooperative Federalism
- The Centre and States should rely on transparent data, consultation and mutually accepted water-sharing arrangements.
- Integrated river-basin management can reduce conflicts and improve long-term water security.
Conclusion
River interlinking may support water security in carefully selected cases, but it cannot be a universal solution. India needs a balanced strategy based on conservation, efficient use, groundwater management, ecological protection and cooperative federalism.
CARE MCQ
Q. Consider the following statements regarding India’s Interlinking of Rivers programme:
- The National Perspective Plan was formulated in 1980.
- It identified 14 links under the Himalayan component and 16 under the Peninsular component.
- The National Water Development Agency was established in 1982.
- The programme is limited exclusively to hydropower generation.
Which of the statements given above are correct?
(a) 1 and 2 only
(b) 1, 2 and 3 only
(c) 2, 3 and 4 only
(d) 1, 2, 3 and 4
Answer: (b) 1, 2 and 3 only
Explanation
- Statement 1 is correct: The National Perspective Plan was formulated in 1980.
- Statement 2 is correct: It identified 30 links—14 Himalayan and 16 Peninsular.
- Statement 3 is correct: The NWDA was established in 1982 to study river-linking feasibility.
- Statement 4 is incorrect: The programme also concerns irrigation, water security, flood and drought management, drinking water and regional development.
FAQs
1. What is the Interlinking of Rivers programme?
- It seeks to transfer water from water-surplus basins to water-deficit regions through reservoirs, canals and diversion structures.
2. How many links are included in the National Perspective Plan?
- It identified 30 links: 14 under the Himalayan component and 16 under the Peninsular component.
3. What is the role of the NWDA?
- The National Water Development Agency studies the technical feasibility of proposed river links.
4. Why does Kerala oppose the Pamba–Achankovil–Vaippar link?
- Kerala argues that it could adversely affect the Vembanad wetland ecosystem.
5. What is demand-side water management?
- It involves conserving existing water and improving efficiency through micro-irrigation, groundwater conservation, rainwater harvesting and watershed management.
6. Why is river interlinking not a universal solution?
- Its limitations include uncertain surplus water, ecological risks, climate change, inter-State conflicts, high costs, land acquisition and displacement.



